Right-of-Way Use Permit
A Public Works Right-of-Way Permit is required for such activities as replacement of or modifications to driveways, temporary placement of industrial trash bins or moving pods. Public Works is responsible for plan review, permit issuance and inspection of Franchise Utility, Telecommunication and Miscellaneous construction work performed in the City rights-of-way and utility easements, as well as management of Franchise and Telecommunications Agreements. The Right-of-Way Use Permit shall be obtained prior to construction and is in addition to any other required permits. Posting a Performance/Warranty Bond may be required. If a Bond is required, you will be notified. Links to our Bond Documents can be found at the bottom of this page. If work is on private property within a public easement, as well as management of Franchise and Telecommunication Agreements.
The Right-of-Way Use Permit shall be obtained prior to construction and is in addition to any other required permits. Posting a Performance/Warranty Bond may be required. If a Bond is required, you will be notified.
If work is on private property within a public easement, a Clearing and Grading Permit may be required.
What is considered the Right of-Way?
The City owns the property under, on and above the roadways and sidewalks, usually extending 10 to 20 feet beyond the roadway pavement. The right-of-way may include the roadway, curb, gutter, sidewalks, vegetation, sewer/water/storm lines, telephone, power and other utility infrastructure.
What is the Cost?
See the current Permit Fee Schedule.
What is the length of Time to Obtain a Permit?
Allow two weeks for review after a complete submittal package is accepted.
What is the Submittal Process?
Required documents for submittal process:
— An Application, completed and signed Right-of-Way Use Permit Application (updated 9/23/2021)
— A Site Plan, drawn to scale (see Permit Application Submittal Requirements under 'Other Documents' below)
— A Traffic Control Plan (MUTCD, Part IV – see Permit Application Submittal Requirements under 'Other Documents' below)
— Any Other Associated Documents
These documents shall be named as shown above in BOLD and shall be submitted as PDF attachments to the email address below:
— [email protected]
— Hard Copies Mailed to:
City of Newcastle
Development Services Tech
12835 Newcastle Way, Ste 200
Newcastle, WA 98056
Attn: Right-of-Way Use Permit
Once you have submitted application documents, access our electronic permitting system, www.mybuildingpermit.com to register for an account.
When your application is approved, you will receive an email notification with information regarding your invoice(s). If a Bond is required, the amount will be included in the email along with a choice of Bond documents to use.
Other Documents that may be helpful:
— Fee Schedule
— Construction Work Hours
Questions: Call (425) 649-4143 ext. 144 or [email protected]